The plot has a total size of 1,010 square meters.
The plot number is: 1411
The building zone is defined as Chalet A.
The plot is subject to the regulation that a construction project is only allowed with a primary residence in Leysin.
The municipality is located away from the largest thoroughfares.
It is accessed by a side road from Le Sépey on the main road 11 Aigle-Col des Mosses.
On November 6, 1900, the cogwheel railway Aigle-Leysin (AL), operated today by the Transports Publics du Chablais (TPC), was inaugurated with three stops in Leysin.
The bus line that operates from Le Sépey to Leysin ensures fine distribution in public transport.
Energy consumption
No dataGreenhouse gas emmissions
No data1854 Leysin (VD)