The electrical connection is installed up to the main panel. All repairs are the responsibility of the buyer, as well as for the water production.
The rental period is determined until the end of March 2028, so the lease contract cannot be renewed.
Energy consumption
No dataGreenhouse gas emmissions
No dataEn Sibourg 11
1566 St-Aubin FR (FR)