Dream panorama! Make the extraordinary your home!
Bernard Nicod SA has the honor of presenting its new development <<Baie d'Opale>>. This will impress you with its high-rise buildings with contemporary architecture and its idyllic location.
The <<Baie d'Opale>> is located 70m from Lake Geneva, directly on the lakeside promenade of Rolle, and was realized by our company Bernard Nicod SA. The project comprises 6 PPE buildings.
The <<Baie d'Opale>> offers apartments from 1.5 to 5.5 rooms with a modern design and spacious living areas as well as excellent lighting. Commercial spaces are also available for sale.
The ground floor apartments have a private garden and all apartments have terraces or balconies. 11 penthouses with panoramic views and roof terraces offer up to 249m2 of living space.
A fitness room will be available to the co-owners. In the basement are the technical rooms, cellars, laundries and an underground car park.
The high-quality and carefully designed outdoor areas will highlight the contemporary architecture of the buildings, which meet the highest standards.
This 5.5-room apartment is located on the second floor of building D3.
It consists of an entrance area with a built-in wardrobe, directly accessible by lift, a living/dining area with an open kitchen and central island unit of more than 60 m2 and access to the covered balcony and terrace, a shower room, a separate WC, a hallway leading to the sleeping area with three bedrooms and a master bedroom with an en-suite bathroom and dressing room. All four bedrooms have access to the outdoor areas. A laundry room with water connections for the washing machine. A storage room.
Two indoor parking spaces (between CHF 48'000.- and 65'000.- per unit extra) complete this property. Indoor parking spaces for motorcycles are also available.
THE ADVANTAGES:
- Minergie P Eco certified
- Heat pump with geothermal probes
- Photovoltaic panels for a reduction in energy costs
- Double ventilation system
- Room thermostat in all rooms
- Free choice of materials for the buyer
- Construction carried out by the company BERNARD NICOD SA
HANDOVER:
D1 – D2 – D3 = 31.03.2025
B2 = 31.05.2025
B1 Centre = 30.09.2025
B1 West = 31.10.2025
Energy consumption
No dataGreenhouse gas emmissions
No data1180 Rolle (VD)