Less than 10 minutes from the A16 motorway and about twenty minutes from the Belfort-Montbéliard TGV station, Fahy enjoys a strategic location, on the border between Switzerland and France, with the possibility of enjoying the advantages of both countries. Quiet, rural, and sunny, nature lovers or pet owners will enjoy an ideal environment. Grocery store, butcher, bakery, garage, gas station, bank, restaurants, and various artisans support the local economy while companies offer sports and musical activities.
This superb plot of land with an area of 1,778 m2 offers the immense advantage of being completely flat and bordering agricultural land. The sunlight is maximal and the possibilities are numerous. Currently fully fenced, the land would also be perfectly suited for keeping animals. One could also imagine establishing a large permaculture, unusual accommodation, creating guest houses or apartments, a seminar or yoga space, a natural pond, or even a real estate development. The configuration of the land allows for all of this.
As for the existing building, erected in 1908 and currently occupied as a single-family home, it has retained an ideal configuration for creating 2 apartments of 3.5 rooms. Indeed, each level already has a kitchen and a bathroom. It should be noted that a heated bedroom has already been arranged in the attic and that this room could very well be allocated to the lower floor to create a beautiful duplex. Finally, the creation of an additional bedroom is still possible in the attic.
The upper ground floor and the 1st floor are therefore identical with an independent kitchen, a bathroom, a bedroom, a living room, and a dining room (in a row).
The house also has a large basement with 2 large cellars, a laundry room, and a storage room.
Some work has been undertaken, including regular maintenance of the roof (currently uninsulated), the replacement of a kitchen in 2016, and the change of windows on the 1st floor in 2017. Finally, the piping between the house and the municipal connection was completely replaced in 2022. Despite this, it can be considered that this house requires a major renovation.
Energy consumption
No dataGreenhouse gas emmissions
No data2916 Fahy (JU)