ALL INFORMATION
THE SPECIAL
- Schedule an appointment with us today for the shell construction viewing - it's worth it!
- Only a few units left on offer
- "BREITI" - These are two multi-family houses with 6 and 8 condominiums, which gently embed themselves into nature and the village image
- The houses are built in an ecological construction method (wood construction)
- Generous living space with well-thought-out floor plans for people of all ages
- Large, covered, and sunny outdoor areas are a given
- The interior design impresses with sustainability down to the last detail and guarantees a standard of finish that meets today's requirements
- Photovoltaic system
- Elevator (from basement to attic)
- Parking garage with underground parking spaces
- Community room as a meeting zone as well as a beautiful garden area to enjoy
THE LOCATION
- The residential complex is located on the eastern edge of the village in close proximity to walking and hiking trails
- From here, the village center with the Volg and the bus stop is just a stone's throw away
- The kindergarten and primary school can be reached by the little residents in about 10 to 15 minutes on safe paths away from the main road
- The secondary school is attended in the neighboring Veltheim thanks to a healthy bike ride or a cozy bus ride
- There is a regular bus connection (line 371, every 30 minutes) towards and to the Brugg train station. The travel time is just under 30 minutes
- From Brugg, various S-Bahn lines operate, e.g., to Zurich (25 minutes), to Basel (45 minutes), to Aarau (15 minutes), and to Olten (30 minutes)
- By car, larger cities like Aarau, Brugg, Lenzburg, or Frick can be reached in about 15 minutes
- The Birrfeld motorway connection with access to the A1 (Bern - Zurich) and the A3 (Basel) can be reached in about 15 minutes
THE CURRENT OFFER INCLUDES
2 ½-room apartments, starting from CHF 515,000.00
last 3 ½-room penthouse apartment, CHF 685,000.00
4 ½-room apartments starting from CHF 895,000.00
Parking spaces in the underground garage starting from CHF 35,000.00
Motorcycle parking spaces in the underground garage CHF 5,000.00
Hobby rooms in the basement CHF 20,000.00
THE TIMING
- The shell construction is ready
- Occupancy House 2 = December 2025 / House 1 = expected February 2026
Have we piqued your interest? Then Ms. Susanne Erismann looks forward to your contact and an appointment for the shell construction viewing.