Last apartment - new build MFH in Felben-Wellhausen:
5 modern apartments and their features, TKB approved
Solidly built
Through the massive construction, we create a solid, long lifespan, high energy efficiency, and a comfortable indoor climate.
Minergie construction method
Building envelope, photovoltaic systems, and the construction method allow us to keep energy demand as low as possible and cover a maximum share with renewable energies. (Without controlled ventilation)
Heating
The MFH is connected to the district heating Felben-Wellhausen. CO2 - Neutral.
Underground parking spaces
Each condominium comes with two parking spaces in the underground garage directly below the living floor and access to the lift.
Empty conduits prepared for wall box (E-mobility).
Cellar room
Each apartment has an adequate cellar room with a wash basin. (Cold water)
Bicycle room
Large bicycle room with its own access and E-mobility sockets.
Rainwater
Is collected in a cistern for reuse for garden, general outdoor tap, underground garage, and terrace.
Energy consumption
No dataGreenhouse gas emmissions
No data8552 Felben-Wellhausen (TG)