Upon completion of the building, we are selling this condominium at the end of April. The apartment will be ready for occupancy and is fully developed. Enjoy the morning and evening sun on 2 balconies, Alpine views, tranquility and an unparalleled living experience with floor-to-ceiling windows and sensational amenities. The entire apartment including access is barrier-free. The apartment was planned as a 4.5-room apartment - currently developed as a 3.5-room apartment, the living/dining area is very spacious - but could be (prepared) subdivided.
Equipment & Details
Swiss kitchen with high-quality appliances (V-Zug), oak parquet with long planks, bathrooms with high-quality ceramic tiles, high-quality fittings and furniture. MINERGIE certificate, comfort ventilation and triple glazing. Fiber optic connection in the apartment, utility room with washing machine/dryer in the apartment, spacious ventilated cellar compartment in the house (included), bicycle cellar with private e-connection (included), all parking spaces with preparation for fast charging station. Built in solid construction with ventilated wooden facade. PV system in co-ownership.
The apartment is located 4 minutes from the outskirts of Schaffhausen, only 35 minutes from Zurich Airport (or 45 minutes to Zurich HB) and in the immediate vicinity of the motorway access (4 minutes), schools and shopping facilities (MMMigros in 5 minutes). You live in the sunniest municipality in Schaffhausen at 700m above sea level and enjoy a 360-degree panoramic view, absolute tranquility and benefit from one of the lowest tax rates in the canton of Schaffhausen.
Nature is literally "at your feet" - you enjoy bike trails that start right in front of the house and offer you more than a hundred kilometers of freedom, hiking and walking without a car - everything is possible.
If you are moving from the canton of Zurich to the canton of Schaffhausen and are planning to withdraw your pension fund assets in the next few years - you will benefit massively: The canton of Schaffhausen, in contrast to Zurich, does not know any progression, you save up to 20%.
Project
The apartment is part of 3 multi-family houses that will be completed in 2025. Each MFH has 9 apartments and forms its own STWE community. Currently, the project still has 4 vacant apartments, the last units will be occupied as planned at the end of April 2025. The 3 MFH are perfectly oriented south/southwest and have extremely advantageous sunshine. The plot borders directly on the agricultural zone and is delimited by its own, 1500m2 large garden plot - which is available to the owners for exclusive use.
We attach great importance to sustainable planning, solid construction and high value retention for buyers while keeping maintenance costs low. The chosen solid construction with ventilated facade ensures, thanks to the MINERGIE certificate, low energy consumption while ensuring a very long service life. The energy for the apartments is generated at a distance of approx. 100m using wood chips and supplied via district heating, the plant is locally owned by two farmers with large forest areas of their own. The entire building was built, with few exceptions, by local and regional craftsmen, the builder himself lives in the same municipality.
Further information can also be found on our project website www.8236.ch
The apartment is sold directly by the developers, no real estate agent is involved. We do NOT want calls from real estate agents, intermediaries or other funny people.
Energy consumption
No dataGreenhouse gas emmissions
No data8200 Schaffhausen (SH)