3 exclusive single-family homes and 1 villa with pool in a preferred location, in the municipality of Binningen, with high energy efficiency and innovative financing concept for sale. The modern high-quality single-family homes and 1 villa are located above the town center in a beautiful villa district and offer the highest standards and a wide variety to meet the needs of their residents. The modern clear architectural language harmoniously integrates into the surroundings and forms its own identity. The development is located in a central attractive location and is connected to the city of Basel by tram. The excellent infrastructure with schools, kindergartens, and access to public transport rounds off the location of Binningen to meet your personal requirements. With a net living area of 184m2 spread over 5.5 rooms and 3 floors, including an attic floor, as well as a 300 m2 large plot, these Minergie-P certified single-family homes offer optimal comfort, low operating costs, and a contemporary, sustainable living experience. The equipment of the houses and villa in terms of flooring, wall design, bathroom and kitchen fittings will be actively determined by the buyer. The interiors impress with their reduced form language and the naturalness of the high-quality materials used. The placement of the houses in the south creates exciting light-flooded insights, the large elevated rooms and window fronts ensure natural light influence, the covered seating area with ground-level access to the private outdoor area emphasizes the overall situation. The houses offer high living comfort with an open kitchen and a master bedroom in the recessed attic floor with en-suite dressing room. The exclusive Minergie P-certified villa with a total living area of 196m2 spread over 3 floors offers a contemporary and sustainable living experience with a generous room height of 265 cm on both levels, open gallery, large covered seating area distributed along the entire length, additional terrace on the upper floor, lift, pool or swimming spa. The houses and villa are sustainably supplied with energy through a photovoltaic system in combination with an autonomous ground probe heat pump and meet the highest ecological standards of today's private residential construction. The room heating is provided by a low-temperature underfloor heating system with room temperature control. In summer, the heating system is reversed and used as free cooling for passive cooling of the rooms. All houses and villa will be equipped with a smart home control system. Each house has 2 parking spaces in its own parking garage. Visitor parking spaces complete the houses. These Minergie-P certified single-family homes combine modern design and sustainability. The clear facade language supports the harmonious integration into the surroundings. The planned start of construction is in autumn 2025. The completion and occupancy of the houses is expected in autumn 2027.
Energy consumption
No dataGreenhouse gas emmissions
No dataHuebweg 7a
4102 Binningen (BL)