Jewel with completed and livable apartment
An apartment, a jewel, has already been developed (completion 2021). The apartment is up to date and immediately livable. The exclusive apartment consists of the following rooms.
Ground floor
- Entrance
- Dining room
- Exclusive kitchen with storage (Käppeli)
- Storage with WM/TU
- Guest toilet
Upper floor
- Living room
- Bathroom - toilet
Attic
- Bedroom
The rest of the house part is still to be developed.
The floor slab (30cm) has already been poured.
The house is heated with an air-water heat pump.
On the western side, there is enough space for a garden, a playground, possibly a tiny house, etc.
Let your thoughts and wishes run free.
Construction description of the developed and completed apartment
Ground floor floor
- Concrete floor approx. 30cm
- Vapor barrier bituminous
- Insulation approx. 10cm aluminum hard foils and 2cm Styrofoam insulation
- Underfloor heating
- Underlay approx. 7cm
- Stoneware tiles
Walls outside facing the street
- Outside timber construction
- Vapor barriers
- Inside beam structure with approx. 18cm stone wool insulation
- Chipboard approx. 2cm
- Gypsum board
- Plaster and paint
Walls outside entrance
- Balcony construction
- Insulation approx. 18cm
**-**Outside fire protection boards
- Inside fire protection boards
- Vapor barriers
- Plaster and paint
Wall kitchen side
- Brick
- Insulation approx. 18cm
- Vapor barriers
- Chipboard approx. 2cm
- Gypsum boards
- Plaster and paint
Interior construction upper and attic
- Wooden construction stairs
- Wooden construction floors upper and attic
- Insulation approx. 2cm, in which the underfloor heating is laid
- Impact sound approx. 1cm
- Parquet
Interior construction bathroom-toilet upper floor
- Structure same as living and bedroom
- No parquet, but stoneware tiles
- on impact sound comes decoupling mat
- Stoneware tiles
Roof
- Tiles
- Wooden construction
- Vapor barrier
- Insulation approx. 18cm between beams
- Roof battens 6cm and approx. 6cm insulation in between
- Gypsum board
- Plaster and paint
Windows
- Triple glazing aluminum/plastic
- Roof window Velux
Seating area street side
- Poured, top with slabs
Seating area West
- Poured, top with slabs and stairs down to the garden
Garden fence
- Street side up to the driveway
- Property boundary courtyard side / south by the stream
Thuja hedge
- Thuja courtyard side from street to garage box
- Thuja street side up to the driveway
Well
- Well with water from its own source
Roof drainage
- Discharge into southern stream
Preparation of the still undeveloped part of the property
Cellar
- UG cellar walls and floor are poured
- UG cellar stairs are poured
Ground floor
- EG floor slab is poured (30cm)
- EG drain for guest toilet is laid
- EG drain for kitchen is laid
Upper floor
- The drains laid in the EG are also for the OG
Attic and tiles
- approx. 20 - 25 years old (Gloor & Baumann Leutwil)
Heating
- Outside heat pump air - water outdoor installation
- EG separate technical room
- EG water connections (hot water/cold water) laid in concrete.
Energy consumption
No dataGreenhouse gas emmissions
No dataDorfstrasse 4
5725 Leutwil (AG)