From November 1st, 2025, a modern residential and commercial building will be created on the historic site of the former Oetterli coffee factory in the suburbs – and you can be part of it from the very beginning!
The stylish architecture, sustainable construction, and prime location make this new building project a unique living and working environment.
Highlights
- High-quality fittings & maximum living comfort
- New building with energy-efficient geothermal heat pump
- All apartments with their own washing machine & tumble dryer (Merker Bianca & Vento)
- High-quality materials, modern architecture & bright rooms
- Controlled apartment ventilation with individual room regulation
- Lift
- Underground car park with car lift
- Just a few minutes from the historic center of Solothurn
- 5-minute walk to Solothurn train station / 2 minutes to the A5 motorway
Apartment offer
- 4x 2.5-room apartments
- 17x 3.5-room apartments
- 5x 4.5-room apartments
Commercial spaces
- 1x Commercial space 1: 93.4 m2
- 1x Commercial space 2: 129.8 m2
Occupancy will take place in 2 stages. Ready for occupancy on 01.11.2025:
- 1x 2.5-room apartment
- 5x 3.5-room apartments
- 2x 4.5-room apartments
- Both commercial spaces
Ready for occupancy on 01.02.2026:
- Remaining 20 apartments
Parking spaces in the underground car park can be rented for CHF 160 per month.
Get a first, impressive impression of the high-quality standard of the apartments with our real-time tour.
Apartment navigator with floor plans, rents, and availabilities:
https://navigator5.beyonity.ch/?id=971A6AC8
Further information on the project, architecture, and location can be found on our project website: https://nks46.ch/
Interested?
Contact us directly via "Contact provider" in the online advertisement. You will automatically receive an email with the option to apply digitally or ask us questions.
Rental from plans is possible – and recommended due to high demand and limited supply. Please be sure to specify the desired apartment number in the "Remarks" field to which your application refers.
Note
Viewings are expected to be possible from June 2025. The apartments will still be under construction at that time. However, material samples will be presented on site.
Energy consumption
No dataGreenhouse gas emmissions
No dataNiklaus-Konrad-Strasse 4
4500 Solothurn (SO)