At Irène Zurkinden-Platz in Basel, directly at the intersection of Münchensteinerstrasse and Walkeweg, a new residential and commercial building is being built with a top modern and contemporary design.
Please note that these images are visualizations and are only intended to give a feeling of space. The materialization and details may differ from the actual execution.
Kitchen equipment:
-Artificial stone covering
-Glass back wall or artificial stone slab
-Touch induction hob, combi-steamer, dishwasher
Bathrooms:
-Floor-level shower with channels and glass partition
-V-Zug washing machines and tumble dryers in every apartment
Floor coverings:
-Living and bedrooms: concrete look
-Bathrooms: artificial stone slabs
-Loggias and winter gardens: artificial stone slabs
-Underfloor heating (operation via room touch device or app)
Sun protection:
-Electric Venetian blinds throughout the apartment (operation via room touch device or app)
Electrical installations:
-Fiber optic connection in every apartment
-Video intercom system (operation via room touch device or app)
-Lift systems with display monitor
-Video surveillance in the entrance hall and the parking garage
-Mailbox system/parcel box system (operation via room touch device or app)
The property will be equipped with two Mobility vehicles, which can be booked for private use. In addition, a large bicycle park will be created in the parking garage.
The very central location stands out due to the public transport hub. Here at the "Dreispitz" stop, a total of six bus and tram lines intersect and an SBB S-Bahn station is located directly adjacent.
You can view all the latest information about the "Syd" project on our homepage www.syd.ch.
Please share your contact details with us. We will gladly keep you up to date.
Energy consumption
No dataGreenhouse gas emmissions
No dataMünchensteinerstrasse 117
4053 Basel (BS)