This new house is currently under construction, with completion expected by the end of summer 2025. The house is designed to be as practical as possible and to appeal to a wide range of clients, from a couple wanting to start a family to a young retired couple.
The house, built on a plot of about 580m2, will include the following:
On the ground floor, we will find the kitchen open to a large living/dining room that provides direct access to the terrace, a bedroom, a bathroom, and a technical room that will also serve as a storage and laundry area.
On the first floor, we will find three bedrooms, one of which has a dressing room, and a large bathroom with a bathtub and Italian shower.
The house is located on a little-frequented street as the path leading to the house is partly private.
Interested in living in a quiet neighborhood while being close to amenities and public transport?
Don't hesitate and ask us for the sales file of this superb new construction.
The interior photos were taken during a previous construction.
Energy consumption
No dataGreenhouse gas emmissions
No data2950 Courgenay (JU)