This new house is currently under construction and the completion of the work is scheduled for the end of summer 2025. The house is designed to be as practical as possible and to appeal to a wide range of clients, from a couple wanting to start a family to a young retired couple.
The house, built on a plot of about 580m2, will consist of the following:
On the ground floor, we will find the kitchen open to a large living/dining room that gives direct access to the terrace, a bedroom, a shower room, and a technical room that will also serve as a storage and laundry area.
On the first floor, we will find three bedrooms, one of which has a dressing room, and a large bathroom with a bathtub and Italian shower.
The house is located on a little frequented street as the path leading to the house is partly private.
Are you interested in living in a quiet neighborhood while being close to amenities and public transport?
Don't hesitate and ask us for the sales file of this superb new construction.
The interior photos were taken during a previous construction.
Energy consumption
No dataGreenhouse gas emmissions
No data2950 Courgenay (JU)