The new construction project in Meinisberg is approved, and the sales start has begun! Here, modern 2.5 to 5.5-room apartments are being built in a quiet, child-friendly environment that is still centrally located. Detailed information about the project can be found on the project website:
www.neubau-meinisberg.ch.
I ndividual design options:
Floor coverings in the bedrooms selectable: parquet or vinyl
Living area with high-quality ceramic tiles (upon request throughout the apartment)
Interior design customizable according to individual offers
Modern living with design freedom
Each apartment offers highest living comfort and can be individually designed according to your wishes. The interior design is freely selectable, based on individual offers. In the bedrooms, parquet or vinyl can be laid optionally, while the remaining living area can be equipped with high-quality ceramic tiles. Those who prefer ceramic tiles throughout the apartment can have this implemented upon request. Additional costs will apply for continuous parquet as this material is more expensive.
Thoughtful architecture & sustainability
Bright, spacious floor plans with optimal space utilization
Ground floor apartments with idyllic seating areas and garden areas under special usage rights
Balconies & loggias for the other apartments – perfect for relaxing
Photovoltaic system for sustainable energy supply
Modern construction with energy-efficient and high-quality materials
Location & surroundings
Meinisberg offers an ideal mix of nature and urban connection. The quiet residential area is child-friendly, and yet shopping opportunities, schools, and public transport are easily accessible on foot.
Nearby recreational area Altarm of the Aare "Häftli" for pleasant walks with children or dogs in the immediate vicinity.
Pricing and materials and construction quality in general
We were able to maintain the very attractive square meter prices from the first project variant despite
price increases, new various additional installations, and even higher quality
executions and materials. Therefore, hardly any additional costs for the building,
installations, and costs for additional efforts will be passed on to the buyers. As already from
the beginning, the investors stand by their <
living space with the highest quality.
Below are some points that are new and additional (higher quality materials, devices
and executions) to the first project version:
House A:
Ground floor: sun protection -> vertical fabric blinds
1st floor: sun protection -> awning fabric blinds
Roofing work: copper
Special facade plaster - window sill artificial stone
Windows outside: aluminum (plastic-metal windows)
Windows inside: plastic (plastic-metal windows)
Roof underside, rafters, eaves and gable board: wood, painted
Fire protection technology at another, even higher, exclusive level
New loggias, at apartment A6 and A9 (with wooden cladding)
House B:
Both buildings in general:
Surroundings:
Construction start & move-in date
The building permit is already available. The apartments are expected to be ready for occupancy 14 to 18 months after the start of construction. Four months before completion, buyers will receive a binding information about the exact handover date. Benefits and risks are expected to pass to the buyers between August 31, 2026, and March 31, 2027.
Parking options & purchase prices
For each apartment, at least one parking space in the garage is planned, which can be purchased for **CHF 35,000.–.
Energy consumption
No dataGreenhouse gas emmissions
No dataHauptstrasse 51
2554 Meinisberg (BE)