In an 18,000 m2 park located south of Ecublens, near Saint-Sulpice and the EPFL. New development of nine buildings with six and eight apartments, ranging from three to four rooms. The buildings will only have one floor above the ground floor. The three upper buildings (A, B, C) are intended for rental and the six others (D to I) for sale by floor. The construction site opened on October 11, 2024. The quality of the construction will be exceptional in terms of material choices and interior finishes. Particular care will be taken with the exterior landscaping. The park will contain more than seventy major trees as well as numerous native plants. The philosophy of the project is to live in a place where the surrounding nature and the large trees give you tranquility. The parking spaces will be located in a large underground car park with direct access to each building. A sixty-square-meter community room will be made available to residents for various activities. Energy production will be carried out for each building using a geothermal heat pump and thermal panels which will relieve, especially in summer, the heat pump and the natural resources of the land. A single-flow system is planned to optimize air quality in the apartments. The heat extracted will be redirected to the heat pump. The construction will be labeled "Minergie". The constructions will also benefit from the "RCP" system, grouping of own consumption. A Free-Cooling system, "cooling of apartments in summer", will complete the many advantages of this new development. We are very happy to be at your disposal by phone or email to answer your various questions. Thank you for reading and have a nice day. Dominique Baldi
Energy consumption
No dataGreenhouse gas emmissions
No dataChemin Des Clos 49
1024 Ecublens VD (VD)