In a park of 18,000 m2 located south of Ecublens, on the Saint-Sulpice side, in immediate proximity to EPFL.
New promotion of nine buildings with six and eight apartments, ranging from three to four rooms. The constructions will only have one floor above ground level. The three upper buildings (A, B, C) are intended for rental and the other six (D to I) for sale in condominium ownership.
The construction site opened on October 11, 2024. The quality of the construction will be exceptional in terms of material choices as well as interior finishes. Special care will be given to the outdoor arrangements. The park will contain more than seventy major trees as well as numerous indigenous plantings. The philosophy of the project is to live in a place where the surrounding nature and the large trees provide you with tranquility. Parking spaces will be located in a large underground parking lot with direct access for each building. A community room of sixty square meters will be made available to residents for various activities.
Energy production for each building will be done using a geothermal heat pump as well as thermal panels that will help relieve, especially in summer, the heat pump and the natural resources of the land. A single-flow system is planned to optimize air quality in the apartments. The heat extracted will be redirected to the heat pump. The construction will be labeled "Minergie". The constructions will also benefit from the "RCP" system for grouping self-consumption. A Free-Cooling system, "cooling of the apartments in summer", will complement the many advantages of this new project.
We are very happy to be at your disposal by phone or email to answer your various questions. Thank you for your reading and I wish you a beautiful day.
Dominique Baldi
Energy consumption
No dataGreenhouse gas emmissions
No dataChemin Des Clos 49
1024 Ecublens VD (VD)