The community house in Wikon LU offers a unique opportunity to live away from hustle and bustle, yet still in close proximity to the city, in the countryside. With eight condominiums being built amidst fruit trees and at the transition to the cultural landscape, the house offers an idyllic living location. There are areas for playing, cultivating plants, and relaxing.
The building is technically and ecologically up to date. It is constructed in contemporary wooden construction, which not only offers ecological advantages but also radiates warmth and coziness in the interior. It meets the highest demands for thermal and sound insulation and is complemented by a ground probe heating system and a photovoltaic system on the roof surfaces. The furnishings and materials of the apartments are robust, nature-oriented, and functional.
The parking space in the underground garage costs an additional CHF 35,000 and the outdoor parking space CHF 15,000.
The new multi-family house offers space for a total of eight condominiums. Two 3½-room and six 4½-room apartments. All apartments are barrier-free and accessible via the airy central staircase with an elevator. This leads down to the basement to the underground garage and the cellar rooms. The space offering is complemented by a multifunctional community room on the ground floor with a kitchen and WC.
The well-proportioned apartment layouts create spaciousness on an appropriate area and are oriented towards the sun's path. The apartments are organized around a central core, which accommodates the wet cells and wardrobes. The living, dining areas, and kitchens are shaped as flowing spatial landscapes and enjoy lighting from up to three sides. The floor-to-ceiling windows bring the outside into the rooms and flood the spaces with daylight.
All apartments have a generous balcony in the foliage layer in the west, overlooking the Wikon "Matte". The ground floor apartments and the community room have direct access from the terrace to the garden.
All necessary building permits have already been granted, and construction is planned to be completed by the end of 2026.
As far as possible, materials and furnishings can still be determined.
If you would like more information about this interesting new building, please request the detailed sales documents with more information and the floor plans. I look forward to your contact.
Energy consumption
No dataGreenhouse gas emmissions
No data4800 Zofingen (AG)