CONSTRUCTION SITE IN PROGRESS - Delivery expected from autumn 2025
REALIZATION OF A MAGNIFICENT PROJECT WITH 18 APARTMENTS IN VILLERET
SITUATION:
The new project with 18 apartments is located in the municipality of Villeret and offers a privileged location between the Chasseral Regional Park and Mont-Soleil, while being close to the main facilities. An intercity bus line from CJ serves the municipalities of Villeret and Saint-Imier.
THE PROJECT:
Sustainable development and ecology are the main features of this project, which is perfectly integrated into its environment. The architecturally demanding construction optimizes the spaces for maximum comfort. The sleek facades with red terracotta tint in fiber cement panels are ventilated. This sustainable construction method has an extremely long lifespan and requires little maintenance. The air gap prevents heat loss and quickly dries the damp facades in winter, while in summer it dissipates heat to ensure a better quality of life. The buildings are connected to the district heating supply of Villeret, which is powered by renewable energies.
THE APARTMENTS:
The arrangement of the buildings allows the apartments to receive maximum daylight through their large windows. Special attention has been paid to the selection of building materials and execution to achieve a high-quality result with minimal environmental impact. The finishes such as kitchen fittings, parquet flooring, tiles, electrical appliances, and sanitary fittings can be selected according to your wishes.
PARKING SPACES:
A parking lot for the entire project is located in the basement. The indoor parking spaces are pre-equipped for the installation of charging options for electric vehicles. The parking spaces are sold separately for the price of CHF 37,000.-
DISCOVER THE COMPLETE PROJECT VILLBA AT:
https://promo.publimmo.ch/de/909103/
Energy consumption
No dataGreenhouse gas emmissions
No data2613 Villeret (BE)