Promotion | Uvrier | Sion to seize!
The project benefits from a heat production based on a heat pump using the groundwater as well as a gas boiler serving
as a backup in case of extreme cold. This heat pump efficiently exploits renewable energy sources, thus contributing to reducing dependence on
fossil fuels and minimizing greenhouse gas emissions.
During the hot summer periods, the housing can have a cooling system
through the floor using groundwater as a production source. This ecological solution offers a
thermal comfort while reducing energy consumption compared to conventional air conditioning
systems.
The shops in buildings A and B benefit from centralized air conditioning all year round, thus avoiding
the use of outdoor air conditioning units.
This approach optimizes energy efficiency and reduces the carbon footprint, while contributing to a beautiful architectural aesthetic.
The site benefiting from a beautiful exposure, photovoltaic panels on the roofs provide
a source of renewable and clean energy, contributing to the energy independence of the site and to the
reduction of electricity costs.
The parking lot is equipped with the infrastructure allowing the installation of charging stations to promote
electric mobility. This installation anticipates the future needs of users with the increase
of electric vehicles in Swiss households in the coming years.
A true sustainable energy ecosystem for the entire Alegria complex is developed
thanks to the expertise of OIKEN SA in various fields. OIKEN SA's meticulous approach
combined with the use of cutting-edge technologies and effective management, in collaboration with the developers, ensures a long-term use of the apartments and commercial spaces.
1.5-2.5-3.5-4.5 room apartments are still available.
Ask us for information to choose the lot that suits you, and we will send you the brochure for the entire project.
The distribution of this accommodation is as follows:
- Entrance, hall with wardrobe
- Bathroom
- 1 bedroom
- Bright living room with open kitchen, dining area and large balcony
Particularities:
- 1 cellar
- Covered parking space CHF 35,000.- in addition
- Heat pump in the groundwater with gas boiler backup + solar
- Electric charging stations planned
- Floor cooling
- 7 minutes from Sion by car
- 10 minutes by bus
- 4 minutes by train from St-Léonard station
- A9 to Sion highway
Additional information at the Agency.
www.immo-trading.com
BT Building Technology Sàrl
At your service for any questions or possible site visits.
Eric Pitteloud
Energy consumption
No dataGreenhouse gas emmissions
No data1958 Uvrier (VS)